Table 2 Scheme design.

From: Study of water-conducting fractured zone development law and assessment method in longwall mining of shallow coal seam

Buried depth H/m

Mining thickness M/m

Longwall face advance D/m

Height of waterconducting fractured zone H1/m

Surface subsidence W/mm

D/H

H/M

W/M (subsidence coefficient)

H1/H

50

4

80

50

1442

1.60

12.5

0.36

1

4

70

50

1434

1.40

12.5

0.36

1

4

50

50

295

1.00

12.5

0.07

1

4

40

45

202

0.80

12.5

0.05

0.9

4

30

30

140

0.60

12.5

0.04

0.6

100

4

160

100

1890

1.60

25

0.47

1

4

140

100

1887

1.40

25

0.47

1

4

100

100

1056

1.00

25

0.26

1

4

90

66

632

0.90

25

0.16

0.66

4

80

42

401

0.80

25

0.10

0.42

220

8.8

300

114

4923

1.36

25

0.56

0.52

8.8

270

114

4900

1.23

25

0.56

0.52

8.8

180

114

3819

0.82

25

0.43

0.52

8.8

150

84

2573

0.68

25

0.29

0.38

8.8

120

64

1016

0.55

25

0.12

0.29

300

7

390

110

4930

1.30

43

0.70

0.37

7

375

110

4878

1.25

43

0.70

0.37

7

270

110

3761

0.90

43

0.54

0.37

7

240

95

3417

0.80

43

0.49

0.32

7

210

87

2886

0.70

43

0.41

0.29