Table 2 Scheme design.
Buried depth H/m | Mining thickness M/m | Longwall face advance D/m | Height of waterconducting fractured zone H1/m | Surface subsidence W/mm | D/H | H/M | W/M (subsidence coefficient) | H1/H |
|---|---|---|---|---|---|---|---|---|
50 | 4 | 80 | 50 | 1442 | 1.60 | 12.5 | 0.36 | 1 |
4 | 70 | 50 | 1434 | 1.40 | 12.5 | 0.36 | 1 | |
4 | 50 | 50 | 295 | 1.00 | 12.5 | 0.07 | 1 | |
4 | 40 | 45 | 202 | 0.80 | 12.5 | 0.05 | 0.9 | |
4 | 30 | 30 | 140 | 0.60 | 12.5 | 0.04 | 0.6 | |
100 | 4 | 160 | 100 | 1890 | 1.60 | 25 | 0.47 | 1 |
4 | 140 | 100 | 1887 | 1.40 | 25 | 0.47 | 1 | |
4 | 100 | 100 | 1056 | 1.00 | 25 | 0.26 | 1 | |
4 | 90 | 66 | 632 | 0.90 | 25 | 0.16 | 0.66 | |
4 | 80 | 42 | 401 | 0.80 | 25 | 0.10 | 0.42 | |
220 | 8.8 | 300 | 114 | 4923 | 1.36 | 25 | 0.56 | 0.52 |
8.8 | 270 | 114 | 4900 | 1.23 | 25 | 0.56 | 0.52 | |
8.8 | 180 | 114 | 3819 | 0.82 | 25 | 0.43 | 0.52 | |
8.8 | 150 | 84 | 2573 | 0.68 | 25 | 0.29 | 0.38 | |
8.8 | 120 | 64 | 1016 | 0.55 | 25 | 0.12 | 0.29 | |
300 | 7 | 390 | 110 | 4930 | 1.30 | 43 | 0.70 | 0.37 |
7 | 375 | 110 | 4878 | 1.25 | 43 | 0.70 | 0.37 | |
7 | 270 | 110 | 3761 | 0.90 | 43 | 0.54 | 0.37 | |
7 | 240 | 95 | 3417 | 0.80 | 43 | 0.49 | 0.32 | |
7 | 210 | 87 | 2886 | 0.70 | 43 | 0.41 | 0.29 |