Figure 8
From: Estimating the critical shear stress for incipient particle motion of a cohesive soil slope

Collected ε − τc data points and the regression lines: (a) Sample-1, (b) Sample-2 and Sample-3, (c) Sample-4, and (d) Sample-5.
From: Estimating the critical shear stress for incipient particle motion of a cohesive soil slope

Collected ε − τc data points and the regression lines: (a) Sample-1, (b) Sample-2 and Sample-3, (c) Sample-4, and (d) Sample-5.