Table 5 Evaluation criteria of the Weaknesses.
From: New energy power system operation security evaluation based on the SWOT analysis
Weaknesses | Matrix in linguistic terms | Matrix in fuzzy terms | Local weights | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
W1 | W2 | W3 | W4 | W5 | W6 | W1 | W2 | W3 | W4 | W5 | W6 | ||
W1 | 1 | AS | SS | PS | 1 | [6, 8] | [1/4,1/2] | [1/4,1/2] | [4, 6] | [1, 2] | 0.1880 | ||
W2 | 1 | MS | PS | [1/8,1/6] | 1 | [1/4,1/2] | [2, 4] | [1, 2] | [1/2,1] | 0.1419 | |||
W3 | MS | MS | 1 | PS | PS | MS | [2, 4] | [2, 4] | 1 | [1, 2] | [1, 2] | [2, 4] | 0.2359 |
W4 | MS | 1 | [2, 4] | [1/4,1/2] | [1/2,1] | 1 | [1/4,1/2] | [1/4,1/2] | 0.1402 | ||||
W5 | MS | 1 | PS | [1/6,1/4] | [1/2,1] | [1/2,1] | [2, 4] | 1 | [1, 2] | 0.1322 | |||
W6 | PS | MS | 1 | [1/2,1] | [1, 2] | [1/4,1/2] | [2, 4] | [1/2,1] | 1 | 0.1617 | |||