Table 10 Multi-step-ahead forecasting for Kon Tum dataset.
Metrics/models | Ensemble SSA GA | Ensemble SSA | Ensemble | LSTM | ANN | ARIMA | |
|---|---|---|---|---|---|---|---|
Q | NSE | 0.611 | 0.549 | 0.508 | 0.428 | 0.246 | 0.396 |
MSE | 4746.415 | 4919.71 | 5365.020 | 8118.964 | 10,712.340 | 7251.454 | |
MAE | 25.738 | 32.909 | 38.824 | 41.681 | 38.596 | 36.815 | |
MAPE | 21.048 | 33.637 | 48.5814 | 45.503 | 37.246 | 33.725 | |
H | NSE | 0.815 | 0.804 | 0.792 | 0.667 | 0.626 | 0.685 |
MSE | 0.053 | 0.056 | 0.059 | 0.099 | 0.110 | 0.087 | |
MAE | 0.131 | 0.143 | 0.165 | 0.196 | 0.183 | 0.171 | |
MAPE | 0.025 | 0.027 | 0.032 | 0.038 | 0.035 | 0.033 | |