Figure 6
From: Simulation and modelling of heavy metals and water quality parameters in the river

Total Temperature of Sarouq River in (a) spring, (b) autumn, (c) winter after calibration.
From: Simulation and modelling of heavy metals and water quality parameters in the river

Total Temperature of Sarouq River in (a) spring, (b) autumn, (c) winter after calibration.