Table 2 Neutralization depth of concrete in the ammonium sulfate workshop.
Sections | Serial number | Testing zones | ||||||
|---|---|---|---|---|---|---|---|---|
1 | 2 | 3 | 4 | 5 | 6 | 7 | ||
Warehouse | F3-1 | 7.76 | 11.63 | 7.91 | ||||
F4-1 | 0.93 | 11.59 | 7.60 | |||||
F5-1 | 8.56 | 16.64 | 9.60 | |||||
F6-1 | 13.60 | 15.03 | 8.57 | |||||
F7-1 | 11.62 | 9.65 | 4.93 | |||||
G3-1 | 9.69 | 5.65 | 6.94 | |||||
Synthesis section (indoor) | A3-1 | 6.77 | 8.25 | 14.33 | ||||
A6-1 | 12.77 | 10.11 | 6.33 | |||||
Synthesis section (outdoor) | A7-1 | 5.11 | 11.47 | 13.42 | ||||
A9-1 | 6.36 | 8.02 | 2.05 | |||||
A10-1 | 9.52 | 9.01 | 11.62 | |||||
B10-1 | 9.71 | 5.51 | 6.94 | 14.26 | 13.05 | 4.17 | 8.46 | |
Vulcanization bed section | A2-2 | 17.33 | 11.25 | 9.79 | 12.05 | 3.14 | 19.22 | 7.90 |
A3-2 | 14.15 | 11.53 | 9.33 | 14.85 | 16.91 | 12.40 | 17.62 | |
Crystallization tank section | A2-3 | 24.22 | 16.90 | 19.51 | 21.87 | 9.93 | 26.89 | 19.72 |