Table 4 Estimation resources of Au for deposit 1 to 5.

From: Geochemistry and mineralogy of auriferous tailings deposits and their potential for reuse in Nova Lima Region, Brazil

Structure

Tonnes (Mt)

Au (mg/kg)

Onces (Moz)

1

501

0.88

14

2

7

0.61

0.179

3

413

0.30

4

4

3350

0.92

100

5

2048

2.30

150