Table 2 Workpiece manufacturing data of workshop.

From: Study of workshop network stability based on pinning control in disturbance environment

Artifacts

Number of artifacts

Workpiece processing technology (processing time)/min

\(J_{1}\)

8

\(M_{1}\)

(8.5)

\(M_{6}\)

(18)

\(M_{12}\)

(12)

\(M_{9}\)

(24)

\(M_{1}\)

(6)

\(M_{16}\)(18.5)

\(M_{20}\)(18.5)

\(M_{10}\)(14.5)

\(M_{1}\)

(6.5)

\(M_{18}\)

(1)

\(M_{11}\)

(20)

\(M_{12}\)(12.5)

    

\(J_{2}\)

8

\(M_{12}\)(12.5)

\(M_{1}\)

(14)

\(M_{6}\)

(25)

\(M_{11}\)

(8)

\(M_{9}\)

(23)

\(M_{2}\)

(15)

\(M_{1}\)

(15)

\(M_{18}\)(32.5)

  

\(M_{20}\)(18.5)

\(M_{9}\)

(7)

\(M_{1}\)

(8)

\(M_{20}\)(20.5)

\(M_{18}\)(18.5)

\(M_{10}\)

(5)

\(M_{20}\)

(27)

\(M_{12}\)(28.5)

\(M_{11}\)

(39)

\(M_{18}\)

(9)

\(M_{11}\)

(7)

     

\(J_{3}\)

3

\(M_{11}\)

(4.5)

\(M_{17}\)(12.5)

\(M_{5}\)

(6.5)

\(M_{17}\)

(5)

\(M_{11}\)

(2.5)

\(M_{17}\)

(5.5)

\(M_{20}\)

(1.5)

\(M_{19}\)

(2)

\(M_{11}\)

(3)

       

\(J_{4}\)

5

\(M_{1}\)

(9)

\(M_{6}\)

(24)

\(M_{9}\)

(24)

\(M_{1}\)

(9.5)

\(M_{17}\)(16.5)

\(M_{16}\)(27.5)

\(M_{20}\)

(6)

\(M_{11}\)

(7)

\(M_{3}\)

(9.5)

       

\(J_{5}\)

3

\(M_{1}\)

(3)

\(M_{6}\)

(8)

\(M_{9}\)

(15)

\(M_{1}\)

(2)

\(M_{10}\)

(16)

\(M_{11}\)

(2)

\(M_{12}\)

(3)

 

\(J_{6}\)

5

\(M_{9}\)

(16.5)

\(M_{11}\)

(8)

      

\(J_{7}\)

2

\(M_{20}\)

(1.5)

\(M_{6}\)

(7)

\(M_{14}\)

(1.5)

\(M_{8}\)

(2)

\(M_{15}\)

(8.5)

\(M_{17}\)

(3.5)

\(M_{16}\)

(22)

\(M_{14}\)

(3.5)

\(M_{15}\)

(10)

\(M_{16}\)(12.5)

\(M_{7}\)

(3)

\(M_{4}\)

(3.5)

\(M_{15}\)

(4.5)

\(M_{16}\)(16.5)

\(M_{15}\)(14.5)

\(M_{16}\)

(5)

\(M_{11}\)

(3)

\(M_{7}\)

(2.5)

      

\(J_{8}\)

15

\(M_{1}\)

(5)

\(M_{6}\)

(13)

\(M_{9}\)(24.5)

\(M_{16}\)(17.5)

\(M_{20}\)

(5.5)

\(M_{11}\)

(8)

  

\(J_{9}\)

10

\(M_{5}\)

(23)

\(M_{18}\)

(16)

\(M_{1}\)

(4)

\(M_{20}\)(10.5)

\(M_{11}\)

(3)

\(M_{13}\)

(5)

 Â