Table 11 Summary of the dead and live loads on deck.

From: A probabilistic approach to lifetime design of offshore platforms

Dead loads

Live loads

Description

Weight (kN)

Description

Weight (kN)

Architectural, electrical, fire and safety, HVAC, instrumentation, mechanical-empty, mechanical- contents, piping-dry, piping-contents, X mass tree

15,800

Open area, laydown area, muster area, building area, drilling, production equipment, chemical liquids

5830