Table 14 Average cost of construction, transportation, and installation of the jacket platform.
From: A probabilistic approach to lifetime design of offshore platforms
Jacket weight (ton) | w < 1000 | 1000 ≤ w < 2000 | 2000 ≤ w < 3000 | 3000 ≤ w < 4000 | 4000 ≤ w |
|---|---|---|---|---|---|
Unit manufacturing cost ($/kg) | 11 | 9 | 8 | 7 | 5 |
Transportation and installation cost ($/kg) | 5 | 4 | 3 | 2 | 1.75 |