Table 14 Average cost of construction, transportation, and installation of the jacket platform.

From: A probabilistic approach to lifetime design of offshore platforms

Jacket weight (ton)

w < 1000

1000 ≤ w < 2000

2000 ≤ w < 3000

3000 ≤ w < 4000

4000 ≤ w

Unit manufacturing cost ($/kg)

11

9

8

7

5

Transportation and installation cost ($/kg)

5

4

3

2

1.75