Table 17 Some parameters for operating and maintaining cost evaluation.

From: A probabilistic approach to lifetime design of offshore platforms

Parameter

\({C}_{re}\)

\({C}_{cp}\)

\({C}_{rti}\)

\({C}_{rpw}\)

\({C}_{hl}\)

\({C}_{flo}\)

%of the initial cost

0.0698

0.0483

0.0994

0.0391

0.0271

0.695