Table 17 Some parameters for operating and maintaining cost evaluation.
From: A probabilistic approach to lifetime design of offshore platforms
Parameter | \({C}_{re}\) | \({C}_{cp}\) | \({C}_{rti}\) | \({C}_{rpw}\) | \({C}_{hl}\) | \({C}_{flo}\) |
|---|---|---|---|---|---|---|
%of the initial cost | 0.0698 | 0.0483 | 0.0994 | 0.0391 | 0.0271 | 0.695 |