Table 7 Comparison of the IGTT with reported optimizers for Modular SR-12 stack.
From: Fuel-cell parameter estimation based on improved gorilla troops technique
Technique | Best.(10–4) | Mean.(10–4) | Worst.(10–4) | STD |
|---|---|---|---|---|
Proposed IGTT | 1.421011 | 19.593 | 281.22 | 5.2776 E−3 |
GTT | 1.421 | 37.144 | 395.870 | 7.1727E−3 |
SDO | 3.637 | 200.940 | 5239.60 | 5.4800E−2 |
FFO | 6.900 | 879.720 | 6600.400 | 9.5520E−2 |
RFO | 8.619 | 4209.200 | 68,075.000 | 9.5157E−1 |
FPA30 | 1589.200 | 11,575.500 | 51,239.500 | 1.04838 |
STSA49 | 8.700 | 1000.200 | 3351.300 | 0.09099 |
EO[ 43] | 12.000 | 195.200 | 739.600 | 0.02002 |
MRFO49 | 625.600 | 7872.700 | 40,135.500 | 0.89801 |
MFO51 | 433.400 | 1321.600 | 3518.400 | 0.05970 |
SSA52 | 968.100 | 1802.800 | 3663.000 | 0.08660 |