Table 7 Comparison of the IGTT with reported optimizers for Modular SR-12 stack.

From: Fuel-cell parameter estimation based on improved gorilla troops technique

Technique

Best.(10–4)

Mean.(10–4)

Worst.(10–4)

STD

Proposed IGTT

1.421011

19.593

281.22

5.2776 E−3

GTT

1.421

37.144

395.870

7.1727E−3

SDO

3.637

200.940

5239.60

5.4800E−2

FFO

6.900

879.720

6600.400

9.5520E−2

RFO

8.619

4209.200

68,075.000

9.5157E−1

FPA30

1589.200

11,575.500

51,239.500

1.04838

STSA49

8.700

1000.200

3351.300

0.09099

EO[ 43]

12.000

195.200

739.600

0.02002

MRFO49

625.600

7872.700

40,135.500

0.89801

MFO51

433.400

1321.600

3518.400

0.05970

SSA52

968.100

1802.800

3663.000

0.08660