Table 10 Residual excavation volume in mining boundary of mining district division plan 1.

From: Research on production capacity planning method of open-pit coal mine

Mining district

3rd mining district

4th mining district

Coal volume (Mt)

Coal B

26.76

0.00

Coal 12

229.65

279.18

Coal 21

82.01

14.18

Coal 31

76.64

131.22

Total coal volume (Mt)

415.06

424.59

Stripping volume (Mm3)

1743.62

1388.74

Stripping ratio (m3/t)

4.20

3.27