Figure 7
From: Electrically conductive composite materials with incorporated waste and secondary raw materials

Effect of cement replacement by fly ash on the resistivity of composites after 7Â days.
From: Electrically conductive composite materials with incorporated waste and secondary raw materials

Effect of cement replacement by fly ash on the resistivity of composites after 7Â days.