Figure 6

Cross map skill (p) of observed and estimated values as a function of the length of the library (L) with 3-day (a–e) and 7-day (f–j) data. The figure was generated by the R 3.6.1 program.

Cross map skill (p) of observed and estimated values as a function of the length of the library (L) with 3-day (a–e) and 7-day (f–j) data. The figure was generated by the R 3.6.1 program.