Table 8 Experimental variables.
From: Hydropower station scheduling with ship arrival prediction and energy storage
Parameter | Value |
|---|---|
Decision variables | 20 |
Population size | 100 |
Maximum iterations | 250 |
Variation rate | 1/20 |
Number of objective functions | 2 |
Crossover probability | 1% |