Figure 23
From: Surface settlement law of double-hole pipe-jacking tunnel undercrossing expressway

Section at 64 m when two tunnels are connected at an interval of 8 m.
From: Surface settlement law of double-hole pipe-jacking tunnel undercrossing expressway

Section at 64 m when two tunnels are connected at an interval of 8 m.