Figure 5

Pie charts showing the CUMLARav for two different evacuation times, for an adult male, a newborn female and female born 10 years after the accident. The fallout scenario was Swedish NPP (Table 2), with Teco,Cs,long = 6.7 y, assuming 3 days’ sheltering, decontamination with 50% efficiency performed after evacuation. Note that Evacav, Decontav, Indoorav and Foodav are given as percent of the total averted risk, and that averted risk, CUMLARav, are given as percental points.