Table 3 Travel time values of road (10th district direction).

From: Framework for assessing bridges construction impact on work zone traffic using BrIM

Stages

Road

Minimum (h)

Maximum (h)

Average (h)

1

Main

0.03

0.11

0.0528

2

Main

0.03

0.15

0.069

2

Detour

0.05

0.13

0.077

3

Detour

0.05

0.13

0.074

4

Main

0.03

0.09

0.0528

4

Detour

0.06

0.08

0.0676