Figure 6

Results of the rolling window analysis after running the function plotFit_GrowthModels(1,3,30). The top panel shows the monkeypox epidemic curve in the USA for reference. The bottom panels show the temporal sequence of parameter estimates (-o-, red line), and their 95% CIs (blue dashed lines) for three different moving time windows (1–30, 2–31, and 3–32).