Table 8 Completion probability based on \(\alpha\) and \(\beta\).
From: Schedule risk model of water intake tunnel construction considering mood factors and its application
Item index | Completion probability (%) | |||||
|---|---|---|---|---|---|---|
\(\beta\) condition | ||||||
100 | 75 | 50 | 25 | 0 | ||
\(\alpha\) condition | 100 | 24.20 | 22.66 | 17.62 | 8.51 | 2.44 |
75 | 38.98 | 36.70 | 29.81 | 16.86 | 3.93 | |
50 | 60.26 | 57.93 | 50.80 | 32.64 | 8.70 | |
25 | 90.66 | 85.77 | 73.48 | 53.25 | 30.86 | |
0 | 99.98 | 90.49 | 88.69 | 78.81 | 50.00 | |