Table 11 Fixed capital cost.

From: Production of hydrogen using plastic waste via Aspen Hysys simulation

Item

Typical factor

Cost (BND$ Dec 2022)

ISBL

1 × ISBL

12,836,270.6

OSBL

0.3 × ISBL

3,850,881.2

D&E

0.3 × ISBL

3,850,881.2

X

0.1 × ISBL

1,283,627.0

Total (fixed capital investment)

21,821,660.1