Table 11 Fixed capital cost.
From: Production of hydrogen using plastic waste via Aspen Hysys simulation
Item | Typical factor | Cost (BND$ Dec 2022) |
|---|---|---|
ISBL | 1 × ISBL | 12,836,270.6 |
OSBL | 0.3 × ISBL | 3,850,881.2 |
D&E | 0.3 × ISBL | 3,850,881.2 |
X | 0.1 × ISBL | 1,283,627.0 |
Total (fixed capital investment) | 21,821,660.1 | |