Table 5 Information statistics of corridor extraction results based on MCR.

From: Construction and optimization of Green Infrastructure Network in mountainous cities: a case study of Fuzhou, China

Lable

Connected hub

Accumulated resistance

Length of corridor (m)

Average resistance

1

1–2

59,988

422

142

2

1–3

73,281

996

74

3

1–4

343,020

9295

37

4

1–7

560,548

4249

132

5

2–7

625,346

5600

112

6

2–8

865,082

10,428

83

7

3–6

990,067

15,704

63

8

3–8

809,755

10,632

76

9

4–5

38,418

824

47

10

5–7

433,745

3566

122

11

6–8

259,728

2290

113

12

6–9

507,086

4088

124

13

6–10

563,122

7182

78

14

7–8

1,297,007

10,601

122

15

7–9

1,417,085

14,020

101

16

8–9

698,636

6418

109

17

9–10

183,401

3886

47