Figure 15
From: Damage and reliability analysis of double-arch tunnel without a middle pilot tunnel under blast load

Depicts the damage to the surrounding rock in the cross-sectional area of the arch parts of the double-arch tunnel at different stages. (a) During the blasting of the left guide tunnel on the upper step of the following tunnel. (b) During the blasting of the right guide tunnel on the upper step of the following tunnel.