Figure 21
From: Damage and reliability analysis of double-arch tunnel without a middle pilot tunnel under blast load

Optimization of the gun holes on the side of the following tunnel that was adjacent to the first tunnel.
From: Damage and reliability analysis of double-arch tunnel without a middle pilot tunnel under blast load

Optimization of the gun holes on the side of the following tunnel that was adjacent to the first tunnel.