Figure 23
From: Damage and reliability analysis of double-arch tunnel without a middle pilot tunnel under blast load

Calculation results of the effective stress at the measurement points after optimization of the scheme. (a) Effective stress at the first tunnel measurement point. (b) Effective stress at the following tunnel measurement point.