Figure 25
From: Damage and reliability analysis of double-arch tunnel without a middle pilot tunnel under blast load

Erection of steel arches in continuous arch tunnels and over-excavation of surrounding rock.
From: Damage and reliability analysis of double-arch tunnel without a middle pilot tunnel under blast load

Erection of steel arches in continuous arch tunnels and over-excavation of surrounding rock.