Figure 27
From: Damage and reliability analysis of double-arch tunnel without a middle pilot tunnel under blast load

Local over-excavation measurements at different positions in continuous arch tunnels. (a) Arch waist of the following tunnel. (b) Arch shoulder of the leading tunnel. (c) Arch waist of the leading tunnel.