Figure 5
From: Damage and reliability analysis of double-arch tunnel without a middle pilot tunnel under blast load

TAJW-2000 rock compression testing apparatus.
From: Damage and reliability analysis of double-arch tunnel without a middle pilot tunnel under blast load

TAJW-2000 rock compression testing apparatus.