Table 5 Cost data for the economic model of the BROU.

From: Technical and financial feasibility of a chemicals recovery and energy and water production from a dairy wastewater treatment plant

Parameter

Value

Parameter

Value

Membrane lifetime-BROU

5 years

Piping cost

15% of equipment cost

Membrane replacement cost

20% of module cost

Peripheral equipment cost

10% of Capital cost

Unit membrane cost-BROU

22 $/m2

 Â