Figure 11

Contour maps around the spur dike with collar: (a) (LC/L = 0.2, LK/L = 0.25, γ = 0.1). (b) (LC/L = 0.2, LK/L = 0.35, γ = 0.2). (c) (LC/L = 0.2, LK/L = 0.45, γ = 0.3). (d) (LC/L = 0.2, LK/L = 0.55, γ = 0.4). (e) (LC/L = 0.2, LK/L = 0.65, γ = 0.6).