Table 4 Installed projects required for the Garver system.

From: Integrated transmission expansion planning incorporating fault current limiting devices and thyristor-controlled series compensation using meta-heuristic optimization techniques

TEP model

Added circuits

No. of added TCSCs

No. added FCLs

Model #1

2–3 (1); 3–5(1); 4–6 (3)

Model #2

4–6 (2)

6

Model #32

4–6 (2)

6

3