Table 4 Installed projects required for the Garver system.
TEP model | Added circuits | No. of added TCSCs | No. added FCLs |
|---|---|---|---|
Model #1 | 2–3 (1); 3–5(1); 4–6 (3) | – | – |
Model #2 | 4–6 (2) | 6 | – |
Model #32 | 4–6 (2) | 6 | 3 |
TEP model | Added circuits | No. of added TCSCs | No. added FCLs |
|---|---|---|---|
Model #1 | 2–3 (1); 3–5(1); 4–6 (3) | – | – |
Model #2 | 4–6 (2) | 6 | – |
Model #32 | 4–6 (2) | 6 | 3 |