Table 7 Installed projects required for the WDN.

From: Integrated transmission expansion planning incorporating fault current limiting devices and thyristor-controlled series compensation using meta-heuristic optimization techniques

TEP model

Added circuits

No. of added TCSCs

No. added FCLs

Model #1

5–6 (1); 33–53 (1); 5–53(2); 36–53 (2); 20–53 (1)

Model #2

6–34 (1); 5–53 (1); 36–53 (2)

6

Model #32

6–34 (1); 5–53 (1); 36–53 (2)

6

4