Table 4 The estimated oil production over 20 years for three flowcharts using ensemble B after EnKF integration.

From: Constraint optimization of an integrated production model utilizing history matching and production forecast uncertainty through the ensemble Kalman filter

Ensemble

Flowchart

Estimated oil production over 20 years of production (MMSTB)

B

I

6.85

II

7.98

III

5.01