Table 2 Installed projects required for enhancing the usage of EVs.
Garver system | |||||||
|---|---|---|---|---|---|---|---|
Case study | Added circuits | Added FCLs (p.u) | Added SVCs (MVAR) | ||||
Curve#1 | Curve#2 | Curve#3 | Curve#1 | Curve#2 | Curve#3 | ||
Without DR (FCL) | 1-5(1),2-3(2), 3-5 (1), 2-6(2), 4-6(1) | 0 | 0 | 0 | 328.7 | 328.7 | 328.7 |
With DR | 1-5(1)*, 2-3(2), 2-6(1)*, 4-6(1) | 0 | 0 | 0 | 262.41 | 148.1 | 196.2 |
IEEE 24-bus system | |||||||
|---|---|---|---|---|---|---|---|
Case study | Added circuits | Added FCLs (p.u) | Added SVCs (MVAR) | ||||
Curve#1 | Curve#2 | Curve#3 | Curve#1 | Curve#2 | Curve#3 | ||
Without DR | 1-2(1), 7-2 (1), 7-8(1) | 0 | 0 | 0 | 747.54 | 747.54 | 747.54 |
Without DR (FCL) | 2.93 + i0.48 | 2.93 + i0.48 | 2.93 + i0.48 | 747.54 | 747.54 | 747.54 | |
With DR | 0 | 0 | 0 | 655.47 | 390.15 | 526.4 | |