Figure 8
From: Solving the resource constrained project scheduling problem with quantum annealing

Annealing schedules with pauses of different lengths (2,4,8,12,16, and 18\(\mu s\)) for a fixed annealing time of 20\(\mu s\). These pauses correspond then to a 10%, 20%, 40%, 60%, 80%, and 90% pause of the annealing time.