Table 8 Numerical results of scenario#2 optimization for 25-bus distribution network.
Method/item | Base Net | IDO | DO | GWO | PSO | AOA |
|---|---|---|---|---|---|---|
Opened switches | 25, 26, 27 | 13, 17, 22 | 14, 9, 22 | 13, 9, 22 | 6, 13, 17 | 14, 17, 20 |
PV location (@bus)/Size (kW)/p.f | –/– | @7/673/0.88 | @14/703/0.84 | @7/685/0.85 | @18/711/0.86 | @14/692/0.85 |
Power loss (kW) | 157.85 | 89.26 | 95.03 | 92.88 | 92.13 | 93.47 |
Voltage sag (p.u) | 0.8440 | 0.6049 | 0.6064 | 0.6058 | 0.6054 | 0.6061 |
THD (%) | 0.5136 | 0.3810 | 0.3819 | 0.3813 | 0.3813 | 0.3817 |
Voltage unbalance (%) | 0.4501 | 0.2801 | 0.2810 | 0.2802 | 0.2803 | 0.2806 |
Energy Not-supplied (MWh) | 4.06 | 3.29 | 3.35 | 3.33 | 3.30 | 3.36 |
SAIFI (failure/customer/yr) | 1.13 | 1.06 | 1.14 | 1.11 | 1.09 | 1.14 |
SAIDI (hour/customer/yr) | 0.91 | 0.83 | 0.92 | 0.87 | 0.85 | 0.90 |
MAIFI (mom/customer/yr) | 3.44 | 2.31 | 2.45 | 2.39 | 2.36 | 2.44 |
Objective function | 1 | 0.7473 | 0.7807 | 0.7656 | 0.7580 | 0.7765 |