Table 5 Summary of results with and without TCSC.
| Â | Without TCSC | With TCSC (Case a) | With TCSC (Case b) | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Base case | MOGWO | MOPSO | MOGWO | MOPSO | MOGWO | MOPSO | |||||||
Real Power Loss (MW) | Reactive power loss (MVAR) | Real Power Loss (MW) | Reactive power loss (MVAR) | Real Power Loss (MW) | Reactive power loss (MVAR) | Real Power Loss (MW) | Reactive power loss (MVAR) | Real Power Loss (MW) | Reactive power loss (MVAR) | Real Power Loss (MW) | Capital Cost of TCSC (US$/KVar) | Real Power Loss (MW) | Capital Cost of TCSC (US$/KVar) |
5.593 | 21.0658 | 5.2833 | 20.4436 | 5.3048 | 20.4656 | 5.0675 | 20.1246 | 5.0834 | 20.1323 | 5.0596 | 149.2531 | 5.0625 | 150.6561 |