Table 1 List of basic situation of drilling holes.

From: Surface damage reduction effect of ultra-high working face in Shangwan coal mine

Number

Termination depth

Quality

logging depth

Beginning date

Completion date

Loose layer

Bed rock

Fracture zone

SD1

187.43 m

A grade

186.70 m

2018.09.19

2018.09.24

69.6 m

98.5 m

 

SD2

177.25 m

B grade

164.70 m

2019.03.5

2019.03.17

44.4 m

83.6 m

46.8 m

SD3

182.52 m

B grade

174.80 m

2019.03.19

2019.03.27

41.4 m

74.3 m

72.0 m