Table 4 Components specification of existing energy system components (case I).

From: Techno-economic and environmental analysis of hybrid energy system for industrial sector of Pakistan

Technology

LESCO 132 KV Grid

Fixed Capacity Genset

Capacity (MW)

132KV

1 MW

Per unit Price ($/kWh)

0.09

0.23

Minimum Load Ratio (%)

-

40%

Lifetime (hours)

-

15,000

Capital Cost ($)

-

105,219.82

Replacement Cost ($)

-

105,219.82

O&M Cost ($)

-

10.79