Table 5 Components specification of on-grid biogas system (case II).

From: Techno-economic and environmental analysis of hybrid energy system for industrial sector of Pakistan

Technology

LESCO Grid

Fixed Capacity Biogas Genset

Capacity

132 KVA

1 MW

Lifetime

-

15,000 h

Capital Cost ($)

-

126,263.78

Replacement Cost ($)

-

126,263.78

O&M Cost ($)

-

10.79