Table 5 The total number of feasible paths, the mean value and standard deviation of each cost for all feasible paths obtain by MOJS and BMOJS when considering path length and threat cost as objective functions.
From: A UAV path planning method based on the framework of multi-objective jellyfish search algorithm
Scenario | Â | Â | Algorithm | |
MOJS | BMOJS | |||
Scenario 1 | Total number | Â | 872 | 1460 |
Path length | Mean | 978.46 | 1018.45 | |
Std | 95.29 | 150.77 | ||
Threat cost | Mean | 6.01 | 5.12 | |
Std | 6.01 | 8.67 | ||
Smooth cost | Mean | 319.29 | 379.95 | |
Std | 102.14 | 183.15 | ||
Altitude cost | Mean | 404.91 | 419.01 | |
Std | 66.56 | 65.30 | ||
Scenario 2 | Total number | Â | 536 | 551 |
Path length | Mean | 1099.03 | 1073.20 | |
Std | 77.79 | 162.14 | ||
Threat cost | Mean | 7.85 | 11.09 | |
Std | 7.20 | 9.89 | ||
Smooth cost | Mean | 397.16 | 358.50 | |
Std | 163.73 | 138.33 | ||
Altitude cost | Mean | 402.53 | 413.10 | |
Std | 40.35 | 65.06 | ||
Scenario 3 | Total number | Â | 243 | 149 |
Path length | Mean | 1080.78 | 1006.39 | |
Std | 200.04 | 140.36 | ||
Threat cost | Mean | 10.28 | 13.47 | |
Std | 9.08 | 12.11 | ||
Smooth cost | Mean | 320.50 | 358.92 | |
Std | 65.90 | 116.87 | ||
Altitude cost | Mean | 451.49 | 409.05 | |
Std | 33.55 | 86.84 | ||