Table 2 Equipment parameters.
Equipment | Rated power/kW | Operation efficiency/% | Climbing/kW |
|---|---|---|---|
GT | 1000 | 35 | − 200,200 |
GB | 800 | 85 | − 160,160 |
P2G | 300 | 60 | − 60,60 |
FC | 200 | 60 | − 40,40 |
WHB | 1200 | 90 | * |
EC | 1000 | 320 | * |
AC | 800 | 120 | * |
CCS | 1000 | 80 | * |
Equipment | Rated power/kW | Operation efficiency/% | Climbing/kW |
|---|---|---|---|
GT | 1000 | 35 | − 200,200 |
GB | 800 | 85 | − 160,160 |
P2G | 300 | 60 | − 60,60 |
FC | 200 | 60 | − 40,40 |
WHB | 1200 | 90 | * |
EC | 1000 | 320 | * |
AC | 800 | 120 | * |
CCS | 1000 | 80 | * |