Table 5 Normalized centrality of risk factors.

From: Coupling analysis of multiple risk factors in deep foundation pit construction of metro station based on the N-K/SNA model

Risk factor

CC

CB

CCI

CCO

Poor awareness of p security (p1)

59.32203

72.91666

4.30614

Insufficient professional skills (p2)

50.72464

70.0000

4.34672

Poor safety emergency response ability (p3)

54.68750

53.84615

2.83973

Inadequate p protection (p4)

50.00000

46.66667

0.25287

Poor physical or mental health (p5)

66.03773

61.40351

5.79575

Violation of operating regulations (p6)

79.54546

57.37705

13.44474

Inadequate equipment maintenance (w1)

55.55556

37.23404

0.19858

Equipment failure (w2)

51.47059

50.72464

1.52208

Unreasonable equipment selection (w3)

53.03030

54.68750

0.40065

Unreasonable arrangement of mechanical work (w4)

54.68750

55.55556

0.41481

Improper construction material storage (w5)

54.68750

44.87180

0.52188

Defective retaining structure (w6)

71.42857

37.23404

0.23399

Insufficient strength and stability of internal support (w7)

71.42857

37.23404

0.25920

Substandard strength of anchor rod and pull rod (w8)

61.40351

37.63441

0.18777

Unqualified construction materials (w9)

49.29578

46.05263

0.22378

Inadequate safety education and training (m1)

42.16867

64.81481

1.96594

Incomplete rules and regulations (m2)

45.45454

64.81481

6.37966

Insufficient safety investment (m3)

31.81818

67.30769

0.09020

Inadequate safety supervision and hidden danger inspection (m4)

76.08696

77.77778

24.66474

Inadequate security disclosure (m5)

46.05263

67.30769

0.60250

Illegal subcontracting (m6)

31.81818

54.68750

0.05415

Unreasonable safety construction organization design (m7)

37.63441

54.68750

0.21102

Poor engineering geological and hydrological conditions (e1)

46.05263

61.40351

2.32271

Harsh weather or natural disasters (e2)

50.72464

67.30769

4.54072

Complicated underground pipeline laying (e3)

51.47059

47.94521

0.55122

Closing to large high-rise buildings (e4)

50.72464

54.68750

1.77538

Complicated peripheral traffic (e5)

53.03030

53.03030

1.62492

Harsh operating environment (e6)

61.40351

66.03773

6.87056

Unspecified or deviation of geological and hydrological survey (t1)

36.08247

55.55556

0.12545

Improper design scheme (t2)

39.32584

54.68750

0.28284

Not prepared special construction scheme (t3)

47.29730

61.40351

1.01669

over-excavation (t4)

68.62745

41.66667

1.55159

Improper construction method of retaining structure (t5)

70.00000

44.87180

2.84119

Error in setting and demolishing supports (t6)

77.77778

37.63441

2.53083

Insufficient monitoring of foundation pit (t7)

74.46809

47.94521

1.35703

Untimely dewatering and drainage (t8)

68.62745

49.29578

0.66679