Table 5 Normalized centrality of risk factors.
Risk factor | CC | CB | |
|---|---|---|---|
CCI | CCO | ||
Poor awareness of p security (p1) | 59.32203 | 72.91666 | 4.30614 |
Insufficient professional skills (p2) | 50.72464 | 70.0000 | 4.34672 |
Poor safety emergency response ability (p3) | 54.68750 | 53.84615 | 2.83973 |
Inadequate p protection (p4) | 50.00000 | 46.66667 | 0.25287 |
Poor physical or mental health (p5) | 66.03773 | 61.40351 | 5.79575 |
Violation of operating regulations (p6) | 79.54546 | 57.37705 | 13.44474 |
Inadequate equipment maintenance (w1) | 55.55556 | 37.23404 | 0.19858 |
Equipment failure (w2) | 51.47059 | 50.72464 | 1.52208 |
Unreasonable equipment selection (w3) | 53.03030 | 54.68750 | 0.40065 |
Unreasonable arrangement of mechanical work (w4) | 54.68750 | 55.55556 | 0.41481 |
Improper construction material storage (w5) | 54.68750 | 44.87180 | 0.52188 |
Defective retaining structure (w6) | 71.42857 | 37.23404 | 0.23399 |
Insufficient strength and stability of internal support (w7) | 71.42857 | 37.23404 | 0.25920 |
Substandard strength of anchor rod and pull rod (w8) | 61.40351 | 37.63441 | 0.18777 |
Unqualified construction materials (w9) | 49.29578 | 46.05263 | 0.22378 |
Inadequate safety education and training (m1) | 42.16867 | 64.81481 | 1.96594 |
Incomplete rules and regulations (m2) | 45.45454 | 64.81481 | 6.37966 |
Insufficient safety investment (m3) | 31.81818 | 67.30769 | 0.09020 |
Inadequate safety supervision and hidden danger inspection (m4) | 76.08696 | 77.77778 | 24.66474 |
Inadequate security disclosure (m5) | 46.05263 | 67.30769 | 0.60250 |
Illegal subcontracting (m6) | 31.81818 | 54.68750 | 0.05415 |
Unreasonable safety construction organization design (m7) | 37.63441 | 54.68750 | 0.21102 |
Poor engineering geological and hydrological conditions (e1) | 46.05263 | 61.40351 | 2.32271 |
Harsh weather or natural disasters (e2) | 50.72464 | 67.30769 | 4.54072 |
Complicated underground pipeline laying (e3) | 51.47059 | 47.94521 | 0.55122 |
Closing to large high-rise buildings (e4) | 50.72464 | 54.68750 | 1.77538 |
Complicated peripheral traffic (e5) | 53.03030 | 53.03030 | 1.62492 |
Harsh operating environment (e6) | 61.40351 | 66.03773 | 6.87056 |
Unspecified or deviation of geological and hydrological survey (t1) | 36.08247 | 55.55556 | 0.12545 |
Improper design scheme (t2) | 39.32584 | 54.68750 | 0.28284 |
Not prepared special construction scheme (t3) | 47.29730 | 61.40351 | 1.01669 |
over-excavation (t4) | 68.62745 | 41.66667 | 1.55159 |
Improper construction method of retaining structure (t5) | 70.00000 | 44.87180 | 2.84119 |
Error in setting and demolishing supports (t6) | 77.77778 | 37.63441 | 2.53083 |
Insufficient monitoring of foundation pit (t7) | 74.46809 | 47.94521 | 1.35703 |
Untimely dewatering and drainage (t8) | 68.62745 | 49.29578 | 0.66679 |