Table 8 Best-found solutions for Example 3.

From: Modelling of an imprecise sustainable production control problem with interval valued demand via improved centre-radius technique and sparrow search algorithm

Algorithms

\(\left\langle {A{P_c},A{P_r}} \right\rangle\) ($/month)

\(\left[ {A{P_L},A{P_U}} \right]\) ($/month)

\({s_p}\) ($/unit)

\({t_w}\) (month)

T (month)

Run time (s)

SSA

\(\left\langle {1259.171945,1046.717448} \right\rangle\)

\(\left[ {212.454497,2305.889396} \right]\)

95.431016

7.670538

21.376478

0.355998

AEFA

\(\left\langle {1259.171945,1046.719306} \right\rangle\)

\(\left[ {212.452639,2305.891251} \right]\)

95.431078

7.670568

21.376690

0.352545

EOA

\(\left\langle {1259.171945,1046.717450} \right\rangle\)

\(\left[ {212.454495,2305.889395} \right]\)

95.431016

7.670538

21.376478

0.206889

GWOA

\(\left\langle {1259.171901,1046.616676} \right\rangle\)

\(\left[ {212.555225,2305.788576} \right]\)

95.428462

7.665533

21.372802

0.223148

TLBOA

\(\left\langle {1259.171945,1046.717451} \right\rangle\)

\(\left[ {212.454495,2305.889395} \right]\)

95.431016

7.670538

21.37648

0.844874

WOA

\(\left\langle {1259.171690,1046.661449} \right\rangle\)

\(\left[ {212.510240,2305.833139} \right]\)

95.428767

7.679334

21.353058

0.183249