Table 9 Worst-found solutions for Example 3.

From: Modelling of an imprecise sustainable production control problem with interval valued demand via improved centre-radius technique and sparrow search algorithm

Algorithms

\(\left\langle {A{P_c},A{P_r}} \right\rangle\) ($/month)

\(\left[ {A{P_L},A{P_U}} \right]\) ($/month)

\({s_p}\) ($/unit)

\({t_w}\) (month)

T (month)

Run time (s)

SSA

\(\left\langle {1259.171945,1046.717446} \right\rangle\)

\(\left[ {212.454497,2305.889396} \right]\)

95.431016

7.670538

21.376478

0.377804

AEFA

\(\left\langle {1258.959761,1051.760034} \right\rangle\)

\(\left[ {212.452639,2305.891251} \right]\)

95.358263

7.653703

21.445708

0.350560

EOA

\(\left\langle {1259.171945,1046.717449} \right\rangle\)

\(\left[ {212.454495,2305.889395} \right]\)

95.431016

7.670538

21.376478

0.228709

GWOA

\(\left\langle {1259.162415,1045.540865} \right\rangle\)

\(\left[ {212.555225,2305.788576} \right]\)

95.398209

7.694925

21.188774

0.205265

TLBOA

\(\left\langle {1259.171945,1046.717444} \right\rangle\)

\(\left[ {212.454495,2305.889395} \right]\)

95.431016

7.670538

21.37648

0.880233

WOA

\(\left\langle {1258.466452,1044.117742} \right\rangle\)

\(\left[ {212.510240,2305.833139} \right]\)

95.377926

7.062932

22.100310

0.191826