Table 14 Best-found solutions for Example 5.

From: Modelling of an imprecise sustainable production control problem with interval valued demand via improved centre-radius technique and sparrow search algorithm

Algorithms

\(\left\langle {A{P_c},A{P_r}} \right\rangle\) ($/month)

\(\left[ {A{P_L},A{P_U}} \right]\) ($/month)

\({s_p}\) ($/unit)

g

\({t_w}\) (month)

T (month)

Run time (second)

SSA

\(\left\langle {1324.784124,0} \right\rangle\)

\(\left[ {1324.784124,1324.784124} \right]\)

96.507765

0.881067

8.000763

22.273360

0.413946

AEFA

\(\left\langle {1324.784057,0} \right\rangle\)

\(\left[ {1324.784057,1324.784057} \right]\)

96.512112

0.881157

8.001556

22.290056

0.400189

EOA

\(\left\langle {1324.784124,0} \right\rangle\)

\(\left[ {1324.784124,1324.784124} \right]\)

96.507765

0.881067

8.000763

22.273359

0.247792

GWOA

\(\left\langle {1324.783677,0} \right\rangle\)

\(\left[ {1324.783677,1324.783677} \right]\)

96.516256

0.881682

7.995454

22.310496

0.263926

TLBOA

\(\left\langle {1324.784124,0} \right\rangle\)

\(\left[ {1324.784124,1324.784124} \right]\)

96.507765

0.881067

8.000763

22.273360

0.860848

WOA

\(\left\langle {1324.781733,0} \right\rangle\)

\(\left[ {1324.781733,1324.781733} \right]\)

96.518660

0.873983

7.994652

22.340653

0.224212