Table 3 Worst-found solutions for Example 1.

From: Modelling of an imprecise sustainable production control problem with interval valued demand via improved centre-radius technique and sparrow search algorithm

Algorithm

\(\left\langle {A{P_c},A{P_r}} \right\rangle\) ($/month)

\(\left\langle {A{P_L},A{P_U}} \right\rangle\) ($/month)

\({s_p}\) ($/unit)

T (month)

Run time (s)

SSA

\(\left\langle {1250.744654,945.987404} \right\rangle\)

\(\left[ {304.757250,2196.732058} \right]\)

91.920500

21.405598

0.307381

AEFA

\(\left\langle {1250.658577,949.352177} \right\rangle\)

\(\left[ {309.104181,2200.010754} \right]\)

92.070689

21.988012

0.278421

EOA

\(\left\langle {1250.744654,945.987403} \right\rangle\)

\(\left[ {301.306400,2196.732057} \right]\)

91.920500

21.405598

0.163038

GWOA

\(\left\langle {1250.743718,945.539296} \right\rangle\)

\(\left[ {305.204421,2196.283014} \right]\)

91.906023

21.343068

0.133599

TLBOA

\(\left\langle {1250.744654,945.987404} \right\rangle\)

\(\left[ {304.757250,2196.732058} \right]\)

91.920500

21.405598

0.976073

WOA

\(\left\langle {1250.722177,943.818644} \right\rangle\)

\(\left[ {306.903533,2194.540820} \right]\)

91.849174

21.099458

0.117917