Table 3 Comprehensive evaluation of the importance of water engineering facilities in the ming dynasty along the grand canal section.
Water engineering facilities | Out-degree | In-degree | Betweenness centrality | Out-closeness centrality | In-closeness cntrality | Ci(comprehensive score index) |
|---|---|---|---|---|---|---|
Yongtong upper gate | 3 | 1 | 3.965 | 0.186 | 0.78 | 0.496 |
Zhongqian gate culvert in yuehe river | 2 | 1 | 4.226 | 0.348 | 0.467 | 0.484 |
Xin (New) dian gate | 1 | 2 | 3.903 | 0.241 | 0.617 | 0.476 |
Huanting gate | 3 | 1 | 3.566 | 0.629 | 0.366 | 0.476 |
Nanyang gate | 2 | 1 | 3.852 | 0.529 | 0.388 | 0.464 |
Jizhou upper (diverting gate) | 1 | 1 | 4.151 | 0.314 | 0.499 | 0.456 |
Shaozhuang gate | 1 | 1 | 4.072 | 0.285 | 0.534 | 0.451 |
Tongji gate (thirty-mile huotouwan gate) | 2 | 1 | 3.621 | 0.153 | 1.013 | 0.45 |
Xin (new) gate | 1 | 1 | 3.989 | 0.261 | 0.574 | 0.446 |
Caojing bridge | 1 | 1 | 3.841 | 0.174 | 0.848 | 0.438 |
Huang donglin new gate | 1 | 1 | 3.804 | 0.465 | 0.412 | 0.435 |
Fengjiaba | 2 | 1 | 3.38 | 0.136 | 1.232 | 0.435 |
Shijiazhuang gate | 1 | 1 | 3.753 | 0.414 | 0.438 | 0.432 |
Liujia mouth | 1 | 1 | 3.712 | 0.162 | 0.925 | 0.43 |
Previously: siliwan reduction gate | 1 | 1 | 3.672 | 0.223 | 0.667 | 0.427 |
Anju gate | 1 | 1 | 3.577 | 0.208 | 0.72 | 0.421 |
Zhaoyang lake gate | 3 | 1 | 2.647 | 1.141 | 0.311 | 0.42 |
Jieshou 1 | 1 | 1 | 3.485 | 0.144 | 1.114 | 0.415 |
Shengjindou gate | 2 | 1 | 2.889 | 0.11 | 1.95 | 0.402 |