Table 9 Optimal release time and development cost for DSI and DSII.

From: Multi release software reliability modelling incorporating fault generation in detection process and fault dependency with change point in correction process

Data sets

Optimal release time (weeks)

Optimal development cost ($)

DSI

17.5

5915.0

DSII

17.5

2005.2